Why should you hire an independent Engineer to manage a contract?
Written by Canute Chandrakumaran – Land Development Team Leader at Thomas Consultants Ltd In most NZS 3910 physical works contracts, the Engineer will be named in the contract. He will not generally be a party to the contract. The Engineer will have input into the design produced on behalf of the principal. The Engineer will…