Skip to content

    Auckland       Manukau     Tauranga

  (09) 836 1804
  • Careers
  • News
Top Menu

”Portal

Thomas Consultants
Quality civil engineering, resource consents and planning
Thomas Consultants
  • Home
  • Services
    • Planning Services
      • Subdivision
        • Subdivision Process
        • Subdivision Cost
        • Rules for Subdivision
        • Subdividing Land Auckland
      • Resource Consents
      • Third Party Liaison
      • Evidence for Hearings
      • Notice of Requirement
      • Project Management
      • Plan Changes and Submissions
      • Feasibility Reports
    • Surveying
      • Subdivision Survey
      • Boundary Redefinition Survey
      • Topographical Survey
      • Set Out Survey
      • Land Surveyors Auckland
    • Civil Engineering
    • Property Negotiations
    • Asbestos Surveying
    • Architecture
    • Landscape Architecture
      • Landscape and Subdivision Design
      • Landscape and Visual Assessments
      • Planting Plans and Garden Design
      • Open Space Design
    • Energy Efficient Building Design
      • Energy Modelling
      • Thermal Modelling
      • Hygrothermal Analysis
      • Building Elements Assemblies
      • Air Tightness
      • Passive Solar Design
      • Building Code H1
      • Solar Panels and Mechanical Ventilation
    • Ecology
      • Ecological Assessments
      • Restoration and Environmental Management Plans
      • Restoration Project Management
      • Stream and Wetland Assessments
    • Soil Contamination
      • Site Investigation
      • Remediation and Management
      • Asbestos in Soil
      • Other Services
  • About
    • About Us
    • What Our Clients Say
    • Our Team
  • Developments
  • Projects
  • Contact Us
  • 中文
 

(09) 836 1804 Email Us

  • Home
  • Services
    • Planning Services
      • Subdivision
        • Subdivision Process
        • Subdivision Cost
        • Rules for Subdivision
        • Subdividing Land Auckland
      • Resource Consents
      • Third Party Liaison
      • Evidence for Hearings
      • Notice of Requirement
      • Project Management
      • Plan Changes and Submissions
      • Feasibility Reports
    • Surveying
      • Subdivision Survey
      • Boundary Redefinition Survey
      • Topographical Survey
      • Set Out Survey
      • Land Surveyors Auckland
    • Civil Engineering
    • Property Negotiations
    • Asbestos Surveying
    • Architecture
    • Landscape Architecture
      • Landscape and Subdivision Design
      • Landscape and Visual Assessments
      • Planting Plans and Garden Design
      • Open Space Design
    • Energy Efficient Building Design
      • Energy Modelling
      • Thermal Modelling
      • Hygrothermal Analysis
      • Building Elements Assemblies
      • Air Tightness
      • Passive Solar Design
      • Building Code H1
      • Solar Panels and Mechanical Ventilation
    • Ecology
      • Ecological Assessments
      • Restoration and Environmental Management Plans
      • Restoration Project Management
      • Stream and Wetland Assessments
    • Soil Contamination
      • Site Investigation
      • Remediation and Management
      • Asbestos in Soil
      • Other Services
  • About
    • About Us
    • What Our Clients Say
    • Our Team
  • Developments
  • Projects
  • Contact Us
  • 中文

Daily Archives: April 7, 2019

reduce cost of resource consents

Reducing the costs of resource consents

BlogBy Forge OnlineApril 7, 2019

It’s the exasperated cry we hear every day. The realities of project deadlines, funding requirements, spiralling interest payments, contractor availability and basic human psychology dictate that everyone needs their resource consent as fast as humanly possible.

© Copyright 2019 Thomas Consultants Ltd. All rights reserved.
Go to Top